"Different classes of rails shall be kept separate in shipment.
"All rails shall be loaded in the presence of the inspector.
[Sidenote: Inspection.]
"17. (_a_) Inspectors representing the purchaser shall have free
entry to the works of the Manufacturer at all times while the
contract is being executed, and shall have all reasonable facilities
afforded them by the Manufacturer to satisfy them that the rails
have been made in accordance with the terms of the specifications.
"(_b_) For Bessemer Steel the Manufacturer shall, before the rails
are shipped, furnish the Inspector daily with carbon determinations
for each heat, and two complete chemical analyses every twenty-four
hours representing the average of the other elements specified in
section 2 hereof contained in the steel, for each day and night turn
respectively. These analyses shall be made on drillings taken from
the ladle test ingot not less than 1/4 in. beneath the surface.